Sunset Ridge Estate

Works carried out for the Sunset Ridge Stage 1 sub-division consisted of

  • Cutting and fill of the roads and blocks as per drawings.
  • Placement of box culverts and headwalls to property access.
  • Water reticulation
  • Ergon and Telstra conduits installed
  • Kerb and Channel
  • Supply place and compaction of unbound pavements for roads and driveways
  • Two coat bitumen seal applied to roads
  • Turf along kerb and Channel
  • Line Marking
  • Installation of street signs
  • Upgrading of Golf Links Road Intersection
    • Remove and dispose of 
      • Existing Kerb and Channel
      • Existing road pavement and asphalt
      • Existing line marking
    • Relocate
      • Existing street signs
      • power pole and light
    • Supply, place and compact unbound pavements
    • Asphalt surfacing
    • Installation of Kerb and Channel and footpath
    • Line marking


Lillypilly lane stage 2/3

Lillypilly Lane Stage 2/3Works carried out for the Lillypilly Lane Stage 2/3 sub-division consisted of cutting and fill of the roads and blocks as per drawings., placement of box culverts and headwalls to property access, water reticulation, Ergon and Telstra conduits installed, kerb and channel, supply place and compaction of unbound pavements for roads and driveways, a two coat bitumen seal applied to roads and hydro mulching of batter

Tableland Acreage Estate

Tableland AcreageWorks carried out for the Tableland Acreage sub-division consisted of cutting and fill of the roads and blocks as per drawings., placement of box culverts and headwalls to property access, water reticulation, Ergon and Telstra conduits installed, kerb and channel, supply place and compaction of unbound pavements for roads and driveways, a two coat bitumen seal applied to roads and hydro mulching of batter.

Atherton Industrial Park

Atherton Industrial ParkWorks carried out for the Atherton industrial Park sub-division consisted of cutting and filling of the roads and blocks as per drawings, supply, place and compaction of unbound pavements, 50mm asphalt application, Ergon and Telstra conduits installed, kerb and channel, water reticulation, sewerage reticulation, stripping and spreading of topsoil and turf laid on the footpaths.Wylandra EstateWorks carried out for the Wylandra Estate Subdivision consisted of cutting and filling of the roads and blocks as per drawings, supply, place and compaction of unbound pavements, 30mm asphalt seal, installation of Ergon and Telstra conduits, kerb and channel, water reticulation, placement box culverts and headwalls, stormwater drainage with a concrete invert and stripping and spreading of topsoil.