Works carried out for the Edgewater sub-division consisted of

  • Removal & Re-spreading of topsoil
  • Storm-water drainage
  • Water reticulation
  • Sewer reticulation
  • Kerb and Channel
  • Supply, place and compaction of unbound pavements for the road
  • Two coat bitumen seal
  • Installation of Ergon and Telstra services
  • Turfing 
  • Landscaping

Yungaburra Village Estate Stage 10

Works carried out for the Yungaburra Village Estate Stage 10 sub-division consisted of

  • Removal & Re-spreading of topsoil
  • Cutting and filling of the blocks as per drawings
  • Storm-water drainage
  • Pressure mains
  • Sewer reticulation
  • Kerb and Channel
  • Supply, place and compaction of unbound pavements for the road
  • Two coat bitumen seal
  • Relocation and installation of street signs
  • Installation of Ergon and Telstra services
  • Turfing 

Sunset Ridge Estate

Works carried out for the Sunset Ridge Stage 1 sub-division consisted of

  • Cutting and fill of the roads and blocks as per drawings.
  • Placement of box culverts and head-walls to property access.
  • Water reticulation
  • Ergon and Telstra conduits installed
  • Kerb and Channel
  • Supply place and compaction of unbound pavements for roads and driveways
  • Two coat bitumen seal applied to roads
  • Turf along kerb and channel
  • Line Marking
  • Installation of street signs
  • Upgrading of Golf Links Road Intersection
    • Remove and dispose of 
      • Existing Kerb and Channel
      • Existing road pavement and asphalt
      • Existing line marking
    • Relocate
      • Existing street signs
      • power pole and light
    • Supply, place and compact unbound pavements
    • Asphalt surfacing
    • Installation of Kerb and Channel and footpath
    • Line marking


Lillypilly lane stage 2/3

Works carried out for the Lillypilly Lane Stage 2/3 sub-division consisted of cutting and fill of the roads and blocks as per drawings., placement of box culverts and headwalls to property access, water reticulation, Ergon and Telstra conduits installed, kerb and channel, supply place and compaction of unbound pavements for roads and driveways, a two coat bitumen seal applied to roads and hydro mulching of batter

Tableland Acreage Estate

Works carried out for the Tableland Acreage sub-division consisted of cutting and fill of the roads and blocks as per drawings., placement of box culverts and headwalls to property access, water reticulation, Ergon and Telstra conduits installed, kerb and channel, supply place and compaction of unbound pavements for roads and driveways, a two coat bitumen seal applied to roads and hydro mulching of batter.

Atherton Industrial Park

Works carried out for the Atherton industrial Park sub-division consisted of cutting and filling of the roads and blocks as per drawings, supply, place and compaction of unbound pavements, 50mm asphalt application, Ergon and Telstra conduits installed, kerb and channel, water reticulation, sewerage reticulation, stripping and spreading of topsoil and turf laid on the footpaths.

Wylandra Estate

Works carried out for the Wylandra Estate Subdivision consisted of cutting and filling of the roads and blocks as per drawings, supply, place and compaction of unbound pavements, 30mm asphalt seal, installation of Ergon and Telstra conduits, kerb and channel, water reticulation, placement box culverts and head walls, storm-water drainage with a concrete invert and stripping and spreading of topsoil.